- $2.5 billion construction cost;
- 45km of new roadway including 6km of bypass roads at Ringwood and Dandenong;
- Three traffic lanes in each direction for 33km from the Eastern Freeway to Thompson Road at Carrum Downs;
- Two traffic lanes in each direction for 6km at the southern end from Thomspon Road to the Frankston Freeway;
- Twin, three-lane, 1.6km tunnels under the Mullum Mullum Valley;
- 103 structures, including 88 bridges;
- Direct freeway to freeway connections at the Eastern Freeway, Monash Freeway and Frankston Freeway;
- Bicycle and pedestrian paths along the entire route;
- 7 million cubic metres of earthworks;
- 25,000 precast concrete elements;
- More than 1 million tonne of asphalt;
- More than 3.5 million plants, including 500,000 trees;
- Fully electronic tolling system interoperable with all other Australian toll roads; and
- EastLink Operations Centre and ConnectEast corporate headquarters in Ringwood.